ASIC and GPU mining infrastructure for Bitcoin, Litecoin, Dogecoin, Monero, Ethereum Classic and other proof-of-work coins. The hardware is the easy part — power capacity, cooling and noise are what actually decide whether a setup is viable.
Buying rigs is the easy decision. What actually determines whether a deployment is profitable and stable is whether the electrical and cooling plan was sized for reality rather than a spec sheet.
Circuits sized to nameplate power trip under real sustained load.
Air cooling that works for ten rigs falls apart at fifty.
Noise levels rule out otherwise-suitable buildings and locations.
No monitoring means a dead rig or a failed PSU goes unnoticed for days.
Rigs, electrical capacity and cooling are planned as one system rather than three separate purchases — so the setup that gets built is the one that actually keeps running.
ASICs for SHA-256 and Scrypt coins (Bitcoin, Litecoin, Dogecoin), GPU rigs for Monero and Ethereum Classic — sourced, assembled and racked.
Circuit and PDU capacity sized against actual sustained draw, not the manufacturer's nameplate figure — that gap is where breakers trip.
Air-cooled racking with proper hot/cold-aisle separation for smaller setups; immersion cooling where density or noise rules it out otherwise.
Electrical capacity planned against sustained draw, with headroom — not the manufacturer's best-case number.
Cooling sized for the room and rig density you actually have, not a generic reference layout.
Monitoring flags a dead board or failed PSU the same day, not weeks later in a payout report.
Which coins, what budget, what site — the answers shape every decision after this one.
Electrical and cooling capacity calculated against sustained draw for the chosen hardware.
Rigs ordered, delivered and racked according to the design.
Per-rig monitoring configured before handover, so failures get flagged automatically.
Bitcoin, Litecoin and Dogecoin on ASIC hardware; Monero and Ethereum Classic on GPU rigs — and other proof-of-work coins on request.
We work with a site you already have or are evaluating — power and cooling design depends heavily on the specific building.
Rig density, ambient temperature and noise tolerance of the site — air cooling covers most small-to-mid setups; immersion earns its cost at higher density.
Tell us the coin, the budget and the site — we'll size the rest properly.